我们的方法

拥有99.8%的可靠性和99%的平均可用性我们的技术和团队拥有支持LNG项目所需的内容



我们已经致力于液化天然气30多年

目前有45个液化天然气的工厂或正在依靠我们的涡轮机械的全球建设 - 这促使全球安装的LNG容量超过350 MTPA。我们是主制冷剂上大型燃气轮机的最负载OEM。

A history of industry firsts

In 1989 at Woodside: first to use a gas turbine train for LNG. In 2008 at Qatargas: five simultaneous major overhauls that cut outage time in half. In 2017 for Petronas: core machinery for the first floating liquefied natural gas (FLNG) facility. In 2019 for Freeport: first to use large motors for e-LNG.

我们的解决方案不断增加了规模经济

Our 7.8 MTPA trains for Qatargas 2 were the world's largest in 2009. In 2018, we took FLNG to new heights after just two years, with 3.6 MTPA capacity on Prelude. And, we installed three electric LNG trains with a combined capacity of 13 MTPA at Freeport in 2019.







我们的专业知识

Supporting 450+ million tons of capacity







精选视频

LM9000 Aeroderivative Gas Turbine—ideal for LNG mechanical drive